Loads of the walls came down. At one point you could see from our master bedroom, through the ensuite bathroom and straight to Jada's room:
And below is a series of photos to show the general progress on the house:
Second floor bathroom plumbing looking through to the main floor below. |
The kitchen getting framed in. The old door's there soon to be replaced by french doors. |
And here they are...the french doors (one of them). |
We moved a claw tub from the basement up to the top floor family bath. Note the cutouts in the wall for shampoo, etc. |
Our kitchen "floor". |
The hall light works now! |
This is the master bedroom looking toward the ensuite. That greenish stuff is the insulation that's been sprayed. |
A passage leading to the backyard. We're sealing it up and turning this space into a cold room/wine cellar. |
We've had a lot of these signs in front our house for the last few months. |
Dry wall arrives! That crane managed to haul it right up to the top floor door. |