Loads of the walls came down. At one point you could see from our master bedroom, through the ensuite bathroom and straight to Jada's room:
And below is a series of photos to show the general progress on the house:
![]()  | 
| Second floor bathroom plumbing  looking through to the main floor below.  | 
![]()  | 
| The kitchen getting framed in. The old door's there  soon to be replaced by french doors.  | 
![]()  | 
| And here they are...the french doors (one of them). | 
![]()  | 
| We moved a claw tub from the basement up to the top floor family bath.  Note the cutouts in the wall for shampoo, etc.  | 
![]()  | 
| Our kitchen "floor". | 
![]()  | 
| The hall light works now! | 
![]()  | 
| This is the master bedroom looking toward the ensuite.  That greenish stuff is the insulation that's been sprayed.  | 
![]()  | 
| A passage leading to the backyard.  We're sealing it up and turning this space into a cold room/wine cellar.  | 
![]()  | 
| We've had a lot of these signs in front our house for the last few months. | 
![]()  | 
| Dry wall arrives! That crane managed to haul it right up to the top floor door. | 













No comments: