Sunday, November 6, 2011

Framing begins

Once everything was stripped back, cleaned and repaired...plumbing lines were run, necessary repairs were made...they were now ready to start framing it all back together. We really did strip back everything in the house. The only room spared from any renovations was the living room. And even in that room, we added ceiling speakers, a gas fireplace and of course new windows.

The master bedroom all framed in with new windows.
Note the rectangular panel on the right for a wall-mounted TV.

Jada's bedroom finally framed in.
That green stuff is soundproofing between here and the master bathroom.

Reverse angle on Jada's room all framed in.

The family bath with a new floor and framing.

The office looking out toward the hall.
That's the family bath on the right.

The master bathroom looking in from the master bedroom.

The master bathroom. You can still see the old doorway on the left.
That's being sealed up. The tub's going in that big space.

Graydon's room with new windows and framing.

Reverse angle on Graydon's room.

New windows in the main floor living room.

Small window in the front entry. This space used to be a closet.
We pulled down the wall to make more room for removing boots before coming in.

The entry to the basement.
Again, new framing to get it ready for electric and then drywall.

New french doors and windows from the kitchen/dining area.

The new windows from the outside.
And of course the deck's been torn down. It's being rebuilt top to bottom.